Skip to content

Inspection and documentation for custom ceramic parts

Agree on what to inspect, how to decide whether the part passes, and which records to share before making the first sample. Jiwei checks agreed critical dimensions and appearance and keeps batch traceability records. Inspection methods and documents are confirmed for each project.

Illustration of a coordinate measuring probe inspecting a ceramic test piece

From drawing review to shipment release

  1. Agree on inspection requirements before quoting

    Provide the drawing revision, mating surfaces, datums, critical dimensions and tolerances, and any surface or edge criteria. Agree on the features to measure, the method and the pass criteria. For results close to a tolerance limit, agree in advance how to account for measurement uncertainty when deciding conformity.

  2. Inspect the first sample

    Tie the inspection to the drawing revision and a sample identifier. For each agreed feature, record the requirement and measured result, or the outcome of an agreed visual check. If a material document or an installed fit or function check is required, agree on the scope and who performs it.

  3. Confirm the lot and release documents

    Jiwei’s quality policy calls for batch traceability from supplier screening and incoming inspection through production oversight and shipment release. Before ordering, confirm the lot identifier, the inspection records or material documents to be shared, and how an exception or change will be reviewed.

What to agree on before ordering

Dimensional and visual inspection
Define the features, drawing limits, datum setup, measurement method and visual criteria. If edge chips matter, agree on the area to check and the allowable size or an approved reference.
Material documentation
Specify the material grade and which supporting document is needed. If you need a property test result, identify the test method, conditions and acceptance limit. Confirm whether the document must identify the same material lot as the parts.
Batch identification and changes
Confirm the lot identifier, which records must accompany each shipment and how a change to the approved material, drawing or process will be reviewed.

Inspection and documentation questions

What should I request in a first-article inspection report?
Ask for the drawing revision, sample identifier, agreed features and tolerances, measured values or visual results, and the acceptance outcome. Confirm the reporting format before sample production.
Can an inspection report show how the part performs after assembly?
Dimensional and visual checks verify the agreed characteristics of the part. For fit, insulation, thermal performance or wear in use, define a separate assembly or service test and agree who will perform it.
What batch records can I request?
Discuss the lot identifier and the inspection, material or release records your receiving team needs. Jiwei confirms which documents can be supplied for the order during project review.

Related quality and engineering information

Quality policy

Read Jiwei’s approach to requirements, material selection, process control and traceability.

Past custom component examples

Discuss inspection for your drawing

Share the drawing revision, material, critical features, quantities and the records your receiving team needs.

Request a quote