Custom ceramic development
Custom ceramic development
From drawing review to a completed first sample, the typical lead time is 4–8 weeks. We confirm the schedule after reviewing your project.

Four steps to a first sample
We confirm the timing of each step during the project review. After the sample is complete, we confirm shipping, customer fit trials and production lead times separately.

Review the drawing and operating conditions
Check the drawing revision, part function, critical dimensions, operating conditions and sample quantity. Identify any information still needed.
Agree on the sampling plan
Confirm the material grade, process, critical tolerances, inspection requirements and target sample completion date.
Make the sample
Prepare the material and make the sample to the agreed plan. Confirm any changes to the material, process or schedule with the customer before proceeding.
Inspect and complete the first sample
Check critical dimensions, appearance and any other agreed criteria. Confirm sample completion and arrange handover with the agreed documents.
Scope to confirm
During the project review, we confirm the material grade, critical dimensions and tolerances, the proposed process, inspection methods and required technical documents. We agree on samples and acceptance criteria for each project.
What to confirm for your project
The material grade, dimensions, performance requirements and technical documentation are confirmed for each project.
Before you enquire
- What should I include in a ceramic part enquiry?
- Start with a drawing reference, material preference, quantity, working conditions and critical dimensions. If the grade is open, describe the function and constraints first.
- Can I start without a complete drawing?
- Yes, the enquiry can start from a functional brief. Final feasibility, dimensions and acceptance criteria still need to be agreed before an order.
- How should I use the product images and specifications?
- The images show the shape of sample components. Share your operating conditions, drawing and critical requirements so we can confirm the grade, dimensions and acceptance criteria for your project.
- How long does it take from drawing review to a completed first sample?
- From drawing review to a completed first sample, the typical lead time is 4–8 weeks. We confirm the schedule after reviewing your project. We confirm the timing of each step during the project review. After the sample is complete, we confirm shipping, customer fit trials and production lead times separately.
Related ceramic components
Discuss your material and drawing
Share the drawing reference, operating conditions, sample quantity and target sample completion date.
Request a quote
